Vernal Pool Development, Restoration, & Maintenance
San Diego Fairy Shrimp Habitat Re-Establishment on Marine Corps Air Station Miramar (MCASM)
ACS successfully executed the planning, installation, and management of two large-scale vernal pool mitigation projects on Marine Corps Air Station Miramar. Thirteen vernal pools required creation or enhancement to meet mitigation requirements associated with development actions on the Station.
Project Details
CLIENT
NAVFAC SW (Naval Facilities Engineering Systems Command Southwest)- Marine Corps Air Station Miramar
PROJECT TYPE
Vernal Pool Development, Restoration, & Maintenance
Project Details
CLIENT
NAVFAC SW (Naval Facilities Engineering Systems Command Southwest)- Marine Corps Base Camp Pendleton
PROJECT TYPE
Vernal Pool Development, Restoration, & Maintenance
San Onofre Vernal Pool Restoration Area (SOVPRA) Vernal Pool Restoration for the P1045 Basewide Water Infrastructure (BWI) Project
ACS performed mitigation actions meeting United States Army Corps of Engineers and United States Fish and Wildlife Service requirements following direct impacts to vernal pools containing the endangered San Diego fairy shrimp and vernal pool indicator plant species resulting from the implementation of the Wire Mountain Reservoir component of the P-1045 project at Marine Corps Base Camp Pendleton (MCBCP).





